Bulk Task Creation

Add several tasks at once instead of creating them one by one.

What is Bulk Task Creation?

Bulk Task Creation is a grid for adding many tasks at once instead of creating them one at a time. It opens with 10 blank rows and you can add more as needed.

Why use Bulk Create?

It's much faster for sprint planning or setting up a batch of similar tasks — especially when several tasks share the same Assignee, Project or Module.

When would I use this screen?

  • Setting up a batch of tasks at the start of a sprint
  • Importing a list of tasks from a file or document
  • Quickly assigning several tasks to the same person and project

Before you start

Open it from My Tasks → Bulk Create. Every row still needs Task Name, Assignee, Duration, Project and Module filled in — the grid doesn't relax any of the normal requirements.

How to create tasks in bulk

  1. Open Bulk Create

    From My Tasks, click Bulk Create.

  2. Fill in each row

    Enter a Task Name for each row, and set Assignee, Duration, Project, Module and Priority.

  3. Use the fill-down shortcut

    Setting the Assignee, Project, or Module on the first row automatically fills that same value down into every other row in the grid — a fast way to fill many rows that all share the same values. Change a row individually afterward if it needs something different.

  4. Remove rows you don't need

    Use the trash icon on a row to delete it, or + Add 5 More Rows if you need more than what's shown.

  5. Click Create Tasks

    This submits every filled row at once. A progress modal shows while your tasks are being scheduled — keep the page open until it finishes.

Importing tasks

Use Import File or Import from Docs at the top of the grid to bring in tasks from a spreadsheet or document instead of typing them by hand, or Download Template to get a blank file in the expected format.

Saving a draft

If you're not ready to submit, use Save Draft to keep your progress, or Clear Draft to start over.

Example

Row 1
QA_TEST_Bulk_1 — Kashish Malik — 15 min — EnOpSy Testing / QA_TEST_Module_Alpha — Low
Row 2
QA_TEST_Bulk_2 — same Assignee/Project/Module via fill-down — Low

Video walkthrough

Video tutorial coming soon
Creating tasks in bulk
Using the fill-down shortcut and submitting a batch of tasks.
Coming soon
Show transcript

Transcript will be added when the video is published.

Common problems

Problem
I clicked Create Tasks and nothing seems to have happened.
How to fix it
Check every row for a missing required field — most commonly a blank Task Name. Right now, submitting with even one row missing a required field silently does nothing rather than pointing out which row is wrong. Go through each row's Task Name, Assignee, Duration, Project and Module one at a time, then try again.
Problem
I only meant to fill in one row's Assignee/Project/Module, but it changed every row.
How to fix it
That's the fill-down behavior described above — setting one of those three fields on any row applies it to the whole grid. Manually change the rows that need a different value afterward.

FAQs

Is there a limit to how many rows I can add?
You can keep adding rows 5 at a time with + Add 5 More Rows; this documentation doesn't confirm an upper limit.
Can I submit a mix of valid and invalid rows?
Right now, Bulk Create is all-or-nothing — if any row is missing a required field, no rows are created. Fix every row before submitting.